Search results for "Two-level scheduling"
showing 9 items of 9 documents
Approximation algorithm for constrained coupled-tasks scheduling problem
2014
International audience; We tackle the makespan minimization coupled-tasks problem in presence of compatibility constraints. In particular, we focus on stretched coupled-tasks, i.e. coupled-tasks having the same sub-tasks execution time and idle time duration. In such context, we propose some complexity results according to several parameters and we design an efficient polynomial-time approximation algorithm.
Computer aided scheduling and routing of vehicle-carrier fleet—a case study
2016
This paper presents a case study of development of an information system for a large enterprise from vehicle-transport industry. A novel optimization model and algorithms developed to solve scheduling and routing of vehicle-carrier fleet are presented and discussed. Carried out qualitative experiments confirmed the usability of developed user-guided search paradigm and high performance of autonomous algorithmic solution search methods.
Time and work generalised precedence relationships in project scheduling with pre-emption: An application to the management of Service Centres
2012
Abstract In this paper we present an application of project scheduling concepts and solution procedures for the solution of a complex problem that comes up in the daily management of many company Service Centres. The real problem has been modelled as a multi-mode resource-constrained project scheduling problem with pre-emption, time and work generalised precedence relationships with minimal and maximal time lags between the tasks and due dates. We present a complete study of work GPRs which includes proper definitions, a new notation and all possible conversions amongst them. Computational results that show the efficiency of the proposed hybrid genetic algorithm and the advantages of allowi…
Tabu Search to Plan Schedules in a Multiskill Customer Contact Center
2006
International audience; We have studied a realistic case of scheduling problem in a customer contact center, dealing with multiskill agents. Our model combines the last two steps of the standard approach by determining shifts and by assigning them to agents at the same time (scheduling and rostering). Moreover, we have considered realistic vacations, according to legal constraints and preferences of agents. We have envisioned entire weeks of work, with variable meal times and meal durations, without overtime. In this paper, we define the problem and describe a Tabu search based solution.
A FAST Method to Achieve Flexible Production Programming Systems
2008
One of the main critical problems in manufacturing system domains is the production scheduling process, because an agile and reactive production planning and scheduling system is essential in manufacturing. The production scheduling process is a complex problem in which finding a suitable production scheduling can greatly increase the effectiveness of highly flexible production processes. Nevertheless, this high flexibility makes the production scheduling and acquisition of relevant data quite complicated. Therefore, there is a strong demand for a universal and flexible tool for production scheduling capable of increasing the utilization of resources and that supports a decision-making proc…
Scheduling Multimodal Transportation Systems
2004
Abstract In this paper a Lagrangian based heuristic procedure for scheduling transportation networks is presented. The solution procedure schedules a single line at a time, possibly correcting the previous decisions at each step.
Two Job Cyclic Scheduling with Incompatibility Constraints
2001
The present paper deals with the problem of scheduling several repeated occurrences of two jobs over a finite or infinite time horizon in order to maximize the yielded profit. The constraints of the problem are the incompatibilities between some pairs of tasks which require a same resource.
HEURISTIC PROCEDURES FOR GROUP SCHEDULING
1989
ABSTRACT The group scheduling problem is investigated, solving numerous small and large sized examples with eight sequencing algorithms. A new approach, basically consisting in the definition of real machines' idles for each group, utilizing allowed shifting of non critical activities, is proposed. Moreover the CDS multi-shot algorithm is extended to group scheduling.
An approximate/exact objective based search technique for solving general scheduling problems
2018
Abstract In this paper, we analyze single machine scheduling problems under the following minimization objectives: the maximum completion time (makespan), the total completion time and the maximum lateness, including fundamental practical aspects, which often occur in industrial or manufacturing reality: release dates, due dates, setup times, precedence constraints, deterioration (aging) of machines, as well as maintenance activities. To solve the problems, we propose an efficient representation of a solution and a fast neighborhood search technique, which calculates an approximation of criterion values in a constant time per solution in a neighborhood. On this basis, a novel approximate/ex…